Jump to content

Bressay Chain Ferry


JustMe
 Share

Recommended Posts

So according to today's Shetland Times Jonathan Wills has been laughed at for proposing a chain ferry for Bressay.  Now I am not saying it would work and I certainly am not saying it would never suffer from weather disruption but surely when a councillor with some experience of marine matters proposes something it should at least be given serious consideration.  Been working for a long time on the Torpoint Ferry between Plymouth and Cornwall.  Yes the Torpoint ferry gets cancelled due to weather once in a while.....as does the Tamar Bridge upstream.....and once in a while the ferries have to stop to let something like a nuclear submarine go past but it works so why not give Councillor Wills a chance!.

Link to comment
Share on other sites

Past consideration of chain ferries in the STAG appraisal.
http://www.zettrans.org.uk/consultation/documents/ExecSummary.pdf

Accurate information?

"the Maritime and Coastguard Agency (MCA) code of practice will only consider 

issue of a certificate allowing a chain ferry to operate in Category A-C waters; 
Bressay Sound is categorised as a Category D water;"

 

Link to comment
Share on other sites

Notwithstanding MCA regs it could probably be made to work, but with location, climate, tides etc its difficult to see that it could be a "better" service however you look at it, than the present one.

 

Not inclined to laugh at Wills for this one, unlike some of his previous suggestions, it was worthy of consideration, but I'm inclined to the opinion that either the status quo or a tunnel are the only all round reasonably viable options for Bressay.

Link to comment
Share on other sites

 

Past consideration of chain ferries in the STAG appraisal.

http://www.zettrans.org.uk/consultation/documents/ExecSummary.pdf

 

Accurate information?

 

"the Maritime and Coastguard Agency (MCA) code of practice will only consider 

issue of a certificate allowing a chain ferry to operate in Category A-C waters; 
Bressay Sound is categorised as a Category D water;"

 

But come the 19th September the MCA may be irrelevant.  Meanwhile some of the points raised in the report may be inaccurate and anyway it seems to be an old document judging by the fares quoted.

Link to comment
Share on other sites

tunnel,tunnel,tunnel stop spending public money on divvy useless projects and do something useful with it that will benefit the public and the tourists and before anybody pipes up and says there is no money,well firstly there is money believe me there is and secondly if the S.I.C stopped wasting huge sums of public money on utter crap then there would be even more money and then maybe they could build another tunnel to link yell and unst

Link to comment
Share on other sites

Na not too expensive or complicated its just that the council are very,very stupid,put it this way if by magic a bridge miraculously appeared over night they would complain that its in the way of the ferry route and have to have a really long expensive meeting lasting many months discussing how best to sail round it !

Link to comment
Share on other sites

Yeh, legal disputes etc, etc......

 

I'm not in favour of bridges though due to Shetland's stormy winters.  I remember coming over the Burra and Trondra bridges in a dark, stormy, seriously windy night a couple of years ago and it wasn't nice!.

 

I was down to 20mph and my car was still being swapped about....

Edited by Kavi Ugl
Link to comment
Share on other sites

The bridge fell at the first hurdle due to the stupidity of the builders managing to piss off the owners of the ground it was going to be built on right from the start. That sort of scenario isn't usually thought to be condusive to a favourable outcome, but our great leaders of the day apparently believed differently, if wrongly, as the bill we had to foot on their behalf evidenced.

 

A bridge probably could have come, had the ground owners been very nicely sweet talked to by the builders, co-operation established on identifying the best location and site design, and a mutually acceptable bridge design jointly developed - probably some kind of lower level opening one would have been most practical and sensible.

 

It may well still materialise though - the SIC just need to keep on hiking up the ferry fares until the the LPA judge the level of tolls they'd need to charge to use a bridge would be less than the fare, and they'll probably build it themselves.

Link to comment
Share on other sites

The bridge was going to be built with legs in the main navigation channel for the harbour. The LPA told the council this at an early stage but were ignored. If I remember correctly the LPA had a tunnel to Bressay priced to show the council it could be built as cheap.Agree with Kavi Ugis comments about bridges in bad weather.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
 Share

×
×
  • Create New...