Had a look along Burravoe Hall today, interesting that the proposed turbines are 6MW as opposed to the 3.6MW planned VE ones meaning that similar turbines could reduce the VE project to 76 turbines. How long before we hear of VE re submitting their plans ?

Anybody with thoughts from the meeting ?

http://beawfieldwindfarm.com/